About Research

We Are Professional
Engineers

An AI production model refers to the deployment-ready version of an artificial intelligence system designed to perform specific tasks within real-world applications. This model is trained using large datasets and complex algorithms to make predictions, automate processes, or generate insights that align with business or operational goals. In production, AI models must maintain high accuracy, scalability, and reliability to handle continuous input, adapt to new data, and provide actionable outcomes efficiently.

about
about Productivity Experiences
Key Features

Key features of AI production model

Scalability

Designed to manage varying amounts of data and operations.

Automation

Ability to function autonomously in a production environment without constant human intervention.

Monitoring & Maintenance

Continuous monitoring of performance and retraining with fresh data to ensure effectiveness.

Optimization

Optimized for speed, storage, and cost to meet business objectives.

Best Team Mates

Our Project Team

team

Prof. Remon Fayek Eskander

Professor of Construction Engineering and Management,
Alexandria University
and Engineering Programs Director,
Alamein International University,
Alexandria, Egypt
team

Assoc. Prof. Elbadr Mohamed Osman

Associate Professor of
Construction Engineering & Project Management,
Head, Construction & Building Department,
Arab Academy for Science,
Technology & Maritime Transport,
Alexandria, Egypt
team

Eng. Esraa Adel EL-Negily

Construction & Building Engineering Department,
Arab Academy for Science,
Technology and Maritime Transport,
Alexandria, Egypt
AI Model

Let’s try the model

Note 1
Range of factor values

“The range of the factor values falls between 1 and 23 within the two-hour period.”
يتراوح نطاق القيم المعنيه للعوامل بين 1-23 خلال فتره ساعتين عمل.

Note 2
Real-time

The results are calculated every two hours.
The model operates on a 24-hour system.
Example:
If you want to determine the predicted productivity from 1 PM to 3 PM, set the midpoint as 2 PM (14:00).
مثال: إذا أردت تحديد الإنتاجية المتوقعة بين الساعة 1 ظهرًا و3 عصرًا، حدد نقطة المنتصف على أنها الساعة 2 ظهرًا وتُكتب (14:00).

MY CART (3 ITEMS)

product-thumb
Construct Map
Green / XL
3 × $198.00
product-thumb
Bridge product
Green / XL
2 × $88.00
product-thumb
Labour helmet
Green / XL
1 × $289.00
SPENT $199.00 MORE FOR FREE SHIPPING TOTAL: $556 PROCEED TO CHECKOUT VIEW CART